Grants for Solar Panels in Northern Ireland

Where every scheme a Northern Ireland farmer is told about actually stands, how hard the one solar grant is to get when it runs, what export pays, and the routes that work without a grant.

  • Independent guidance
  • Sourced 2026 data
  • Check any installer on the MCS register
  • No installer agenda

Realistic expectations about the NISEP grant

The NISEP grant is the only scheme that has paid towards business solar PV in Northern Ireland, so it is worth knowing how it works before relying on it. It is part of the Northern Ireland Sustainable Energy Programme, which is administered by the Energy Saving Trust for the Utility Regulator and paid for through a levy on electricity customers; Power NI runs the commercial scheme. When a round is open it pays 20% of the cost, with the business paying 80%, and the solar PV grant is capped at £30,000 (NISEP list of schemes 2026-27, p.33). The programme year runs from 1 April to 31 March or until funds are exhausted, funds are limited for each scheme, and scheme managers keep waiting lists when a scheme is oversubscribed. A property that has had a grant for the same measure in the last 15 years is not eligible (p.2), Power NI says the grant is not suitable for new builds and is subject to de minimis aid, and no order may be placed or work started before a grant offer.

The 2026/27 round has already closed for applications. Power NI expects the next to open in April 2027, subject to funding approval, and the Utility Regulator has extended NISEP to 31 March 2029 with a break clause after March 2028. So even in a good year, a 20% grant on a farm array is a bonus that covers a fifth of the cost for those who get in early, not something to build the business case around. Plan the array on its own numbers — cash, finance or a power purchase agreement — with capital allowances doing most of the tax work.

Northern Ireland schemes and solar panels, scheme by scheme

Reviewed 3 November 2026 against the Power NI grant and tariff pages, the NISEP scheme list, and the DAERA and Invest NI pages listed under Sources.

SchemeStatusWhat it offersSolar panels?
NISEP-funded solar PV grant (Power NI Commercial Energy Saving Scheme, for the Utility Regulator)Closed for applications for 2026/27 (Power NI, read 3 November 2026); next round expected April 2027, subject to funding approvalWhen open: 20% grant, the business pays 80%; solar PV grant capped at £30,000; subject to de minimis aidYes, for commercial and non-domestic property in NI (Power NI files it under "Business & Farm") — but not open now
Sustainable Farming Investment Scheme (DAERA)Round 1 ran 21 July to 3 September 2026 and is closed; further rounds expected, no dates40% of the reference price, up to £25,000 per businessNo rooftop or ground solar PV on the round 1 item list (small solar water pumps and fence energisers only)
Energy Efficiency Capital Grant (Invest NI)Paused: not accepting enquiries or new applications; no reopening dateHistoric (April 2024 guidance): up to £150,000 at 30–50%Farms were excluded when it was open
Farm Business Improvement Scheme – Capital (DAERA)Closed since 2022Capital grants (historic)No — renewable energy projects were excluded
Rural Business Development Grant Scheme (DAERA)Runs in windows for rural micro-businessesSmall capital grantsSolar panels are excluded
Northern Ireland Renewables Obligation (NIRO)Closed to all remaining technologies on 31 March 2017ROCs for already-accredited generators onlyNot available for a new farm array
Smart Export GuaranteeGreat Britain only ("Installations must be located in Great Britain" — Ofgem)Supplier export payments in GBDoes not apply in Northern Ireland
Power NI microgeneration export tariffCurrent: 1 October 2026 to 30 September 2027 (reviewed annually)11.88p per kWh exported, settled on actual meter readingsYes — paid on exported solar output; other suppliers set their own rates

On the DAERA side, the Sustainable Farming Investment Scheme is the one to watch. DAERA expects further rounds, and each publishes its own item list; round 1's had no rooftop or ground-mounted solar PV, batteries or heat pumps. Until a list includes panels, do not plan a project around it.

Which funding routes apply to your farm? A two-minute check

No farm capital grant lists solar panels in England, Scotland or Wales, and Northern Ireland's 20% NISEP grant for business solar has closed for its 2026/27 round, but tax relief, export payments and some loans still apply. Answer seven questions (an eighth, on how you would fund it, is optional) and the routes that fit your farm appear below. Add your details if you want them talked through: we reply by email, no obligation.

How your enquiry is handled

SolarPanelsForFarms.uk is an independent guide published by SEO Dons Ltd, not an installer. We reply by email. We never sell or auction your details, and we do not pass them on without your say-so. The routes above are a summary of the schemes on this page, not tax advice: check the current rules with your accountant and the scheme's own guidance before you commit.

If a grant doesn't fit: the routes Northern Ireland farms use

Export: a supplier tariff, not SEG

Northern Ireland has no Smart Export Guarantee — Ofgem's scheme requires installations to be in Great Britain — and the NI Renewables Obligation is closed to new generation. Farms are still paid for export: Power NI's microgeneration export tariff is 11.88p per kWh from 1 October 2026 to 30 September 2027, set by the supplier and reviewed each year, and since 1 October 2022 export has been settled on actual meter readings rather than a deemed share. Other suppliers set their own rates, so ask yours. Set the export rate against the unit price on your own bill: a kWh used in the parlour, the poultry house or the grain store saves the full import price, so the right size comes from twelve months of half-hourly meter data and the daytime floor of the load, not from the size of the roof. Our cost ladder runs the sums for 30, 50, 100 and 250 kW with the assumptions stated.

What a farm roof generates here

PVGIS, the European Commission's solar model, puts a south-facing 30° roof near Coleraine at about 116 kWh per kWp in June and 18 in December; near Armagh the figures are 114 and 22. At PVGIS's optimal tilt the annual figure runs from 843 kWh per kWp near Derry/Londonderry to 922 near Belfast. On cost, the only official series is DESNZ's Great Britain median of £1,262 per kW for 10–50 kW systems; Northern Ireland is not in that series, so treat it as a reference and compare itemised quotes.

Planning and rates in brief

Rooftop panels on a farm building fall under Part 37 of the Planning (General Permitted Development) Order (Northern Ireland) 2015. Part 37 sets no kW figure of its own, but the Order covers microgeneration, which article 2 defines as plant up to 50 kW electrical, so treat a larger roof array as needing planning permission and confirm with your council; stand-alone arrays are limited to 30 m². For rates, generating plant up to 50 kW is not rateable under the Rates (Microgeneration) Order (Northern Ireland) 2012. The planning guide has the detail.

Grid connection

NIE Networks connects farm arrays under its own G98/NI and G99/NI rules, with a fast track since 1 May 2026; the limits, timings and capacity map are on our Northern Ireland farm solar page.

How to be ready if a scheme opens

By county

Our county guides cover the local farming mix, yields and grid position: County Antrim, County Down, County Armagh and County Tyrone, with the funding picture for every UK nation on farm solar grants.

Questions about solar grants in Northern Ireland

Are there grants for solar panels in Northern Ireland for farms?

None is open as of 3 November 2026. The grant that has covered business solar PV in Northern Ireland — Power NI's NISEP-funded scheme, paying 20% of the cost with the solar grant capped at £30,000 — has closed for applications for 2026/27, and Power NI expects the next round to open in April 2027, subject to funding approval. DAERA's Sustainable Farming Investment Scheme round 1 closed on 3 September 2026 with no rooftop solar on its item list, the Invest NI Energy Efficiency Capital Grant is paused (and excluded farms when it was open), and the Farm Business Improvement Scheme – Capital closed in 2022.

Can farms in Northern Ireland get paid for generating renewable electricity?

Yes, for the electricity they export, through their supplier rather than a government scheme. The Smart Export Guarantee covers Great Britain only and the NI Renewables Obligation closed to new generation in 2017, but Power NI pays 11.88p per kWh for microgeneration export from 1 October 2026 to 30 September 2027, reviewed each year, and export has been settled on actual meter readings since 1 October 2022. Other suppliers publish their own rates.

Will the NISEP solar grant reopen in 2027?

Power NI says that, subject to funding approval, the next scheme is expected to open for applications in April 2027. The Utility Regulator has extended NISEP from 1 April 2027 to 31 March 2029, with a break clause after 31 March 2028. When a round runs, funds are limited and scheme managers keep waiting lists if it is oversubscribed, a property that has had a grant for the same measure in the last 15 years is not eligible, new builds are excluded, and no order may be placed or work started before a grant offer.

What support does still apply to farm solar in Northern Ireland?

Tax relief and export income. Solar panels are special-rate plant: the £1m Annual Investment Allowance lets most farm businesses deduct the full cost from taxable profits in the year of purchase, and companies can instead claim the 50% first-year allowance on new special-rate assets. Full expensing does not apply to solar. Plant up to 50 kW is not rateable in Northern Ireland. VAT on a farm-business installation is charged at 20% and is reclaimable if the business is VAT-registered.

Do farm solar panels need planning permission in Northern Ireland?

Rooftop panels on a farm building can be permitted development under Part 37 of the Planning (General Permitted Development) Order (Northern Ireland) 2015. Part 37 sets no kW figure of its own, but the Order covers microgeneration, which article 2 defines as plant up to 50 kW electrical, so treat a larger roof array as needing planning permission and confirm with your council. A stand-alone array is limited to 30 m².

Sources

Figures last verified 3 November 2026. Cite this page as: SolarPanelsForFarms.uk (SEO Dons Ltd), “Grants for Solar Panels in Northern Ireland: Farms 2026”, https://solarpanelsforfarms.uk/northern-ireland-farm-solar-grants/.

Send your Northern Ireland farm details

Free enquiry. We reply by email; no obligation, no pressure.

🔒 We never sell or auction your details, and we do not pass them on without your say-so. GDPR-compliant. Read our privacy notice.

Free
Enquiry
No
Obligation
0
Leads sold on

Accreditations to check before you sign with a farm solar installer

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001
Get a free farm solar quote

Free enquiry · no obligation