Sourced answers to the questions farmers ask before putting solar on a farm building. Last reviewed 9 November 2026.
Common concerns about farm solar, answered
These are the reasons farmers most often give for putting a project off. Each answer points to the page on this site where the figure is sourced.
“It costs too much up front.”
DESNZ puts the median installed price of a 10–50 kW system at about £1,262 per kW, so a 50 kW roof is roughly £63,100 before tax relief. Solar panels are special-rate plant, and most farm businesses can deduct the full cost from taxable profits in the year of purchase through the £1 million Annual Investment Allowance. If capital is the problem, hire purchase spreads the cost and a power purchase agreement removes it. Our farm solar cost guide and finance options page set out each route.
“I should wait for a grant.”
No farm scheme in England, Scotland, Wales or Northern Ireland lists solar panels as of 3 November 2026, and England’s last round closed to full applications on 31 July 2025 with no new round announced. A grant also comes off the cost you can claim tax relief on. Waiting for a round that may not come costs a year of bought-in electricity; the dated position is on our farm solar grants page.
“Export pays almost nothing, so it will not pay back.”
That is half right. In Great Britain each licensed supplier sets its own Smart Export Guarantee rate, and it is well below what a farm pays to import. The return comes from the electricity used on the farm, which is why an array is sized to daytime demand (milk cooling, ventilation, cold stores, grain drying) and not to the roof. The cost ladder shows the arithmetic at four sizes with the assumptions stated.
“My sheds are old, or the roof is asbestos cement.”
The structural survey decides, not the age of the building. HSE describes asbestos cement roofs as fragile and advises against drilling through them, so the usual choices are a different building, a ground frame, or a re-roof with the array as part of the job. Our guide to solar panels on asbestos roofs covers the rules and the options.
“I will need planning permission.”
Usually not for panels on a farm building. In England they are normally permitted development under Class J, with the council’s prior approval needed above 50 kW; Scotland, Wales and Northern Ireland have their own classes and limits. Listed buildings and ground-mounted arrays are different. See planning permission for farm solar.
“The grid will not let me connect.”
Any system above 16 A per phase needs the network operator’s G99 approval before installation, and the offer sets the cost and timescale of any works. Where the local network is constrained, an export-limited design often makes a connection possible, because it caps what the site sends out without limiting what the farm uses. Our grid connection page explains the routes.
“I am a tenant, so it is not my decision.”
It is a joint one. You need the landlord’s written consent, and the agreement should say who owns the array and what happens to it at the end of the tenancy. Our guide to solar panels on a tenanted farm covers the points to settle first.
How much do solar panels for a farm cost in the UK?
Dairy and livestock parlour installs (30–250 kW): £32,000–£225,000. Arable rooftop installs (50–500 kW): £45,000–£500,000. Ground-mount agrivoltaic schemes (500 kW–10 MW): £350,000–£8m+. Cost per kW is typically £750–£1,000 for rooftop above 100 kW, £600–£800/kW for ground-mount above 500 kW.
What's the payback for a dairy farm solar install?
5–6 years. Dairy farms have outstanding self-consumption (24/7 milk cooling, parlour pumps, lighting) — often 90%+ of generation is consumed on site. Combined with 100% AIA tax relief, dairy installs sit alongside cold-chain warehouses as the fastest-payback segment in UK commercial solar.
Can we install solar on asbestos cement farm roofs?
No — asbestos cement roofs must be replaced first. The most common solution is a combined re-roof + PV install where the PV business case partially funds the re-roof. CAR 2012 governs asbestos handling — only licensed contractors can remove asbestos cement. Most modern installs sit on profiled steel re-clads.
What about agrivoltaics — solar above crops or grazing?
Agrivoltaics is emerging quickly in the UK. Sheep grazing under elevated panels is well-established. Crops (typically shade-tolerant: leafy greens, soft fruit, hops) under translucent panels is showing promising trial results. Defra and NFU are engaged. SFI 2025 is expected to add specific agrivoltaic compatibility actions.
What grants are available for farm solar?
100% AIA tax relief is universal. SFI actions support agrivoltaic schemes and biodiversity-stacked installs. Farming Investment Fund occasionally relevant. Welsh and Scottish farms have their own devolved schemes with often-higher intervention rates. SEG provides ongoing export income.
Do tenant farmers need landlord consent?
Yes — for any structural alteration to buildings or land use change. Most institutional landlords (Crown Estate, Church Commissioners, Wellcome Trust, county councils) have standard tenant-PV addenda. Private landlords vary. We provide the lease addendum template. Some landlords prefer to fund directly with a service-charge recovery from the tenant.
Does solar work on poultry or pig sheds?
Yes — and the economics are often excellent. Modern free-range and broiler poultry sheds have huge clear-span roofs and high year-round ventilation loads. Pig units have high heating loads in cold months and ventilation in summer. Self-consumption typically 80%+. Biosecurity protocols (boot dips, restricted access, cleaning) apply during install.
What's the play for an arable farm with seasonal grain-drying load?
Two routes. (1) Size for grain-drying peak — large rooftop or ground-mount, accept lower self-consumption outside drying season, lean on SEG export income. (2) Size smaller for daytime baseload only, add battery for grain-drying season. We model both — the right answer depends on your specific load profile and capital tolerance.
Will solar interfere with farm operations during install?
Rooftop installs almost never. We schedule around your busy seasons — calving, lambing, harvest. The only outage is final grid connection (4–8 hours), scheduled for a quiet period. Ground-mount installs need vehicle access for several weeks but don't interrupt main farm operations.
Can farms lease land for solar to a third-party developer?
Yes — this is the ground-mount lease model. Typical lease £900–£1,300/acre/year (significantly above arable rental income), 25–40 year terms, third-party developer takes all capex/operational risk. Suits farms with marginal land that's underused. Take independent land-agent advice on any developer's offer before you sign.
What about my supermarket buyers — do they care?
Increasingly yes. Tesco Stronger Starts, Sainsbury's Plan for Better, M&S Plan A, Waitrose First Generation, Morrisons (committed to net-zero British farming by 2030) — all flow into supplier requirements via CDP Supply Chain disclosures, EcoVadis, and contract terms. Solar generation evidence is auditable Scope 2 reduction.
How long does the install take?
From contract to commissioning: 4–9 months for rooftop installs. Physical install: 1–8 weeks depending on size. DNO connection is the long pole — 6–18 months for G99. We submit DNO application immediately to compress timeline. Ground-mount above 1 MW typically 12–18 months total including planning.