Professional agricultural solar panel installation for UK farms. MCS certified installers, grant support, 3-5 year payback. Reduce energy costs by up to 80%.
Frequently asked questions
How much can solar panels save on my farm energy bills?
Most farms reduce electricity costs by 70-80% with properly sized solar systems. A typical 100kW system can save £20,000-£35,000 annually depending on energy consumption and electricity rates. Savings continue for 25+ years.
What grants are available for farm solar installation?
The main scheme is the Farming Equipment and Technology Fund (FETF) offering up to 40% funding with a £100,000 maximum grant. Countryside Stewardship and regional schemes provide additional support. We handle all grant applications as part of our service.
Will solar panels work during winter on my farm?
Yes, solar panels generate electricity year-round, though output is lower in winter. UK farms typically see 30-40% of annual generation during October-March. Systems are sized accounting for seasonal variation, and many farms benefit from battery storage for winter resilience.
Do I need planning permission for farm solar panels?
Most agricultural building-mounted systems qualify for permitted development rights, requiring no planning permission. Ground-mounted arrays may need permission depending on size and location. We handle all planning requirements as part of our installation service.
What maintenance do farm solar panels require?
Solar panels require minimal maintenance - typically one annual inspection and occasional cleaning if needed. Systems include 25-year performance warranties. We provide ongoing monitoring and maintenance services tailored to farming operations.
Can I install solar if I'm a tenant farmer?
Yes, tenant farmers can install solar with landlord consent. Many landlords support solar installations as they increase property value and demonstrate environmental stewardship. We assist with landlord negotiations and can structure agreements benefiting both parties.
How long does farm solar installation take?
After securing grants and permissions (typically 2-3 months), physical installation takes 1-4 weeks depending on system size. We schedule installation around your farming calendar to minimize disruption to critical operations like harvest or calving.
What happens to excess electricity my farm generates?
Excess electricity is exported to the grid through the Smart Export Guarantee (SEG), earning you income at £0.05-£0.15 per kWh depending on your tariff. Many farms also install battery storage to maximize self-consumption and provide backup power.