Solar Panels for Farms in Pembrokeshire
Specialist agricultural solar PV across Pembrokeshire and the wider Pembrokeshire area, including Carmarthenshire, Ceredigion. MCS-certified, capital grant-backed, fixed-price proposals within 7 working days.
Agricultural solar panels in Pembrokeshire
Pembrokeshire is one of Wales’ most intensively farmed counties, and almost every enterprise here runs the kind of round-the-clock electrical load that solar pays back fastest against. The county’s dairy herds dominate the inland plateau around Haverfordwest and Narberth, where parlours, bulk-milk tank refrigeration and vacuum pumps draw power day and night. Beef and sheep finishing units sit alongside them, and the famous Pembrokeshire Earlies — the early new potatoes lifted from the mild, free-draining red soils of the south coast — bring grading sheds, cold stores and irrigation pumps that all run hardest in the long-daylight spring and summer months. That seasonal pattern matters: when a Pembrokeshire potato store or dairy is pulling its heaviest load between April and September, a rooftop array is generating at full tilt, so a high share of every kilowatt-hour is used on site rather than exported.
Pembrokeshire enjoys some of the best solar irradiance in Wales. Its far south-westerly position and maritime climate deliver roughly 1,050–1,100 kWh per kWp installed each year — comfortably ahead of the Welsh average and close to the figures seen in the south of England. The local distribution network is run by National Grid Electricity Distribution (NGED, South Wales), the operator you will deal with for any grid connection or export agreement, and most farm-scale connections proceed under the standard G99 process. With commercial electricity still costing 28–34p per unit, a well-sized agricultural array in Pembrokeshire typically pays for itself in 2 to 4 years and then delivers two decades of low-cost generation against rising grid prices.
Farm solar across Pembrokeshire by district
Pembrokeshire’s farming character changes markedly from the dairy interior to the early-potato coast and the upland edges near the Preseli Hills. The table below shows the typical pattern we see by district.
| Area | Dominant farming | Typical system | Payback |
|---|---|---|---|
| Haverfordwest | Dairy, mixed arable | 50–150 kWp parlour & shed roofs | 1.7–2.3 yr |
| Narberth | Dairy, beef finishing | 40–100 kWp barn & cubicle roofs | 1.8–2.4 yr |
| Pembroke | Beef, sheep, arable | 30–80 kWp livestock buildings | 1.9–2.5 yr |
| Milford Haven | Mixed, potato grading & cold store | 60–200 kWp shed roofs | 1.6–2.2 yr |
| Tenby / Saundersfoot | Early potatoes, mixed coastal | 30–90 kWp grading sheds | 1.8–2.4 yr |
| Fishguard | Sheep, beef, upland mixed | 25–70 kWp barn roofs | 2.0–2.6 yr |
These ranges assume rooftop mounting on existing agricultural buildings with the generation matched to genuine on-site demand. Dairy and potato-storage enterprises with strong daytime and summer loads sit at the faster end of the payback band; upland sheep and beef units with lighter, more seasonal demand sit toward the longer end.
Grants and tax relief for Pembrokeshire farms
Pembrokeshire is in Wales, so the funding landscape is different from England — there is no FETF here. The schemes that apply to a Pembrokeshire farm are:
- Welsh Government Farm Business Grant — capital grants covering up to 40% of eligible costs, typically in the £12,000 to £100,000 band, aimed at on-farm efficiency and renewable improvements. This is the headline scheme for Welsh agricultural solar.
- Glastir efficiency support — Welsh agri-environment and resource-efficiency funding that can sit alongside renewable investment on qualifying holdings.
- Annual Investment Allowance (100%) — solar PV qualifies as plant and machinery, so the full capital cost can be written off against taxable farm profits in the year of installation, materially shortening the net payback.
- Smart Export Guarantee (SEG) — payment from your electricity supplier for surplus generation exported to the grid, which is common for dairy and potato farms generating heavily in summer when daytime demand dips.
Stacking the Farm Business Grant against the 100% AIA write-down is what drives the fastest paybacks. We model every available route into the fixed-price proposal so you can see the net position before committing. There is more detail on our farm solar grants and funding page.
Planning and grid in Pembrokeshire
The dominant landscape constraint here is the Pembrokeshire Coast National Park, the only wholly coastal national park in the UK, which wraps the south and west of the county from Tenby round to Fishguard and St Davids. Much of the inland farming heartland around Haverfordwest and Narberth lies outside the park boundary, which is where the bulk of straightforward projects sit.
For most farms the planning position is favourable. Rooftop solar on existing agricultural buildings is generally permitted development in England and Wales, subject to size and siting limits, so a parlour roof or grain-store array outside the National Park rarely needs a full application. Inside the National Park, or on a listed building, the bar is higher and rooftop schemes need to be designed sympathetically — panel colour, frame setback and visibility from the coast path all come into play. Ground-mounted arrays in any designated area normally require planning consent and a landscape and visual assessment, so we steer ground-mount proposals toward unconstrained land away from the park where possible.
On the grid side, your distribution network operator is National Grid Electricity Distribution (NGED, South Wales). Connections up to the standard threshold proceed under the G99 fast-track process; larger arrays may need a formal connection application and, in some rural parts of the county where the network is constrained, an export limitation device to keep within the available capacity. We handle the G99 paperwork and the DNO liaison as part of every installation.
Typical Pembrokeshire farm solar projects
The figures below are representative ranges for the enterprise types we install across Pembrokeshire — not single named farms. Indicative gross cost is £600–£900 per kWp, falling to roughly £360–£540 per kWp net once grant support and the AIA tax write-down are applied.
-
Dairy parlour, Haverfordwest belt (60–120 kWp): parlour, refrigeration and vacuum-pump load runs steadily through the day, giving very high self-consumption. Typical gross spend £40,000–£100,000, net considerably lower after Farm Business Grant and AIA, with payback toward the faster 1.6–2.0 year end.
-
Early-potato grading and cold store, south coast (80–200 kWp): grading, washing and chilled storage peak in the long-daylight spring and summer exactly as the array generates hardest. Strong summer load with SEG income on shoulder days; payback typically 1.7–2.2 years.
-
Beef and sheep unit, Pembroke or Fishguard (25–70 kWp): lighter, more seasonal demand across livestock buildings, often paired with a battery to capture evening and winter use. Payback generally 2.0–2.6 years.
-
Mixed arable and machinery farm, inland Pembrokeshire (40–100 kWp): workshop, drying and handling load spread across the year, with surplus exported under SEG. Payback in the 1.8–2.4 year range.
Every Pembrokeshire project begins with half-hourly meter data analysis and a structural survey before any panel is specified, so the system is sized to your real consumption rather than a generic template. For a full breakdown of pricing by system size, see our guide to agricultural solar panel costs, then request a fixed-price proposal for your holding.
Postcodes covered in Pembrokeshire
- SA61
- SA62
- SA63
- SA64
- SA65
- SA66
- SA67
- SA68
- SA69
- SA70
- SA71
- SA72
- SA73
Other areas we cover
Pembrokeshire farm solar — frequently asked questions
How much do solar panels cost for a farm in Pembrokeshire?
Agricultural solar in Pembrokeshire costs £600–£900 per kWp installed gross — about £360–£540 per kWp net after FETF and 100% AIA. Most Pembrokeshire farms install 50–250 kWp systems (£35,000–£175,000 gross / £19,000–£105,000 net). A typical 100 kWp barn-roof system runs £60,000–£75,000 gross, £36,000–£45,000 net.
What grants are available for farm solar in Pembrokeshire?
The Welsh Government Farm Business Grant — Efficiency funds 40% of eligible cost (£12,000–£100,000 band) and stacks with the 100% Annual Investment Allowance. Glastir Efficiency and Farming Connect advisory support are also available.
What is the payback period on farm solar in Pembrokeshire?
Most Pembrokeshire farm solar systems pay back in 2–4 years after FETF and 100% AIA. Dairy and poultry units — with high 24/7 electricity demand — sit at the fast end (1.6–2.0 years); seasonal arable holdings sit toward 2.2–2.6 years. After payback every kWh generated is effectively free for the remaining 20+ years of the system's life.
Do I need planning permission for farm solar in Pembrokeshire?
Roof-mounted solar on existing agricultural buildings in Pembrokeshire is generally permitted development, so no full planning application is required. Ground-mount arrays, listed buildings, conservation areas and AONB-visible sites may need consent — we handle the Pembrokeshire Local Authority application as part of every quote.
Which Pembrokeshire postcodes do you cover for farm solar?
We cover every Pembrokeshire postcode, including SA61, SA62, SA63, SA64, SA65, SA66, SA67, SA68, SA69, SA70, SA71, SA72, SA73. Our installation teams reach all of Pembrokeshire and the surrounding area (Carmarthenshire, Ceredigion), with a free desk feasibility turned around in 3 working days.