SolarPanelsForFarms.uk

Farm Solar by UK Region

How much solar each part of the UK already has, what systems cost there, what a farm roof generates, and which planning rules apply — from DESNZ, PVGIS and the planning orders of all four nations.

Where your farm is changes three things about solar: how much a roof generates, what installation tends to cost, and which planning rules apply. It changes less than people expect. On PVGIS a south-facing 30° roof ranges from about 803 kWh per kWp a year near Inverness to 1,164 near Chichester — and DESNZ's regional mean prices for 10–50 kW systems in 2025/26 ran from £1,234 per kW (North East) to £1,409 (South East). A farm's own daytime demand usually matters more than its postcode.

The regions side by side

Regional guideSolar installed, July 2026Mean price, 10–50 kW (per kW, 2025/26)30° roof yield (kWh/kWp/yr)Rooftop permitted development
South West4,579 MW£1,369Truro 1,059, Exeter 1,045England — Class J
South East and London3,809 + 421 MW£1,409 / £1,247Chichester 1,164, Canterbury 1,089, Oxford 1,009England — Class J
East of England3,576 MW£1,306Norwich 1,022, Peterborough 1,026England — Class J
Midlands1,897 + 2,653 MW£1,316 / £1,330Shrewsbury 963, Newark-on-Trent 994England — Class J
North West1,070 MW£1,347Carlisle 905, Lancaster 908England — Class J
North of England1,291 + 505 MW£1,347 / £1,234York 960, Hexham 912England — Class J
Wales1,774 MW£1,362Carmarthen 980, Welshpool 931Wales — Part 43, no kW cap
Scotland919 MW£1,387Dumfries 899, Aberdeen 877, Inverness 803, Kirkwall 846Scotland — Class 6J, no kW cap
Northern Ireland418 MWNo DESNZ data (GB only)Armagh 895, Coleraine 877NI — Part 37, up to 50 kW

Sources: DESNZ Solar photovoltaics deployment (July 2026, Table 4); DESNZ Solar PV cost data 2025/26 (Great Britain only — regions with two figures show each DESNZ region); PVGIS v5.3, queried 26–27 September 2026; the permitted development orders of England, Scotland, Wales and Northern Ireland.

South West has the most installed solar of any region (4,579 MW). The UK total at the end of July 2026 was 22,992 MW.

Planning differs by nation

Rooftop solar on a farm building is permitted development in all four nations, but the limits differ. England's Class J and Scotland's Class 6J have no capacity cap; England adds a prior-approval step on design and glare above 50 kW. Wales's Part 43 has no capacity cap and no prior approval. Northern Ireland's Part 37 covers microgeneration only — up to 50 kW — so a larger roof system there needs planning permission. Each regional guide sets out the detail, and planning permission for farm solar covers England in full.

Funding by nation

No grant for solar panels on farms is open in any UK nation as of September 2026. England's Improving Farm Productivity grant has closed; Scotland's Future Farming Investment Scheme and Northern Ireland's Sustainable Farming Investment Scheme have not listed solar panels; and Wales offers a 3% loan through the Development Bank of Wales rather than a grant. Capital allowances apply everywhere. The dated, sourced detail is on our farm solar grants page, and our guide to capital allowances for farm solar explains the tax relief.

Choose your region

For county-level pages, see all county guides.

Get a free farm solar quote

Free desk feasibility within 3 working days. Fixed-price proposal within 7. No obligation, no pressure.

🔒 We never sell or auction your details, and we do not pass them to multiple installers without your say-so. GDPR-compliant. Read our privacy notice.

3 days
Desk feasibility
7 days
Fixed-price proposal
0
Leads sold on

Accreditations to check before you sign with a farm solar installer

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001
Get a free farm solar feasibility

Desk study within 3 working days · no obligation