SolarPanelsForFarms.uk

UK Farm Solar — Regional Coverage

9 regions, 69 county pages, every UK farm postcode. Pick your region for local DNO timings, AONB rules, FETF/CARES/DAERA grants and irradiance data.

All 9 UK regions we cover

South East England

12 counties
DNO: UKPN · Irradiance: 1,050 kWh/m²/yr

Kent, Surrey, Sussex, Essex, Herts, Bucks, Oxon, Berks, Hants, Beds, IoW, London. UKPN delivers UK's fastest G99 turnaround (6-10 weeks). 1,050 kWh/m²/yr — second-highest UK irradiance. Kent Downs / Surrey Hills / Chilterns / Sussex High Weald AONBs.

Read regional guide →

South West England

8 counties
DNO: NGED · Irradiance: 1,100 kWh/m²/yr

Cornwall, Devon, Somerset, Dorset, Gloucestershire, Wiltshire, Bristol, BANES. UK's highest regional irradiance at 1,100 kWh/m²/yr. Dartmoor, Exmoor and South Downs National Parks. Mendip / Cotswolds / East Devon AONBs.

Read regional guide →

East of England

6 counties
DNO: UKPN · Irradiance: 1,080 kWh/m²/yr

Norfolk, Suffolk, Cambridgeshire, Essex, Bedfordshire, Lincolnshire. UK's grain belt — Norfolk + Suffolk + Cambs + Lincs produce ~30% of UK cereal output. Holkham + Sandringham estate solar routes. Flat topography simplifies ground-mount.

Read regional guide →

Midlands

13 counties
DNO: NGED · Irradiance: 1,000 kWh/m²/yr

Warwickshire, Staffordshire, Worcestershire, Leicestershire, Notts, Derbyshire, Northants, Rutland, West Midlands, Shropshire, Herefordshire. Most diverse single region. The West Midlands rural belt has the strongest farm solar demand we see.

Read regional guide →

North of England

4 counties
DNO: Northern Powergrid · Irradiance: 950 kWh/m²/yr

Yorkshire, North Yorkshire, Northumberland, Durham. Dairy + beef + arable + Vale of York pigs. Yorkshire Dales + North York Moors National Parks. Northern Powergrid 8-12 weeks G99 typical.

Read regional guide →

North West England

4 counties
DNO: ENWL · Irradiance: 950 kWh/m²/yr

Cumbria, Lancashire, Cheshire. Cheshire is UK dairy capital (~100,000 dairy cows). Lake District National Park, Forest of Bowland + Arnside & Silverdale AONBs.

Read regional guide →

Scotland

12 counties
DNO: SP Distribution / SSEN · Irradiance: 900 kWh/m²/yr

East Lothian, Borders, Aberdeenshire, Highlands, Orkney, Shetland + 6 more. Long summer daylight (18+ hours June). CARES interest-free loans up to £150k. SRDP grants up to 50% on islands. ANM curtailment on Orkney + parts of Highlands.

Read regional guide →

Wales

9 counties
DNO: NGED / SP Manweb · Irradiance: 980 kWh/m²/yr

Cardiff, Swansea, Powys, Gwynedd, Carmarthenshire, Pembrokeshire, Ceredigion, Monmouthshire, Anglesey. Welsh Farm Business Grant Energy quarterly windows 40% capital. Anglesey has highest Welsh sunshine hours (1,540/yr).

Read regional guide →

Northern Ireland

4 counties
DNO: NIE Networks · Irradiance: 960 kWh/m²/yr

County Antrim, Down, Armagh, Tyrone. Strong dairy concentration. Armagh is the Orchard County. DAERA Farm Energy Efficiency Scheme 40% capital, annual spring window.

Read regional guide →

UK farm solar economics by region

Three regional factors materially affect farm solar economics:

  1. 1. Solar irradiance — UK regional irradiance ranges from 900 kWh/m²/yr in northern Scotland to 1,100 kWh/m²/yr in the South West. A typical 100 kWp system generates 95,000 kWh/yr in Cornwall versus 80,000 kWh/yr in the Highlands — a 16% spread that shifts payback by roughly 6 months.
  2. 2. Grant scheme — England farms access FETF (40% capital, £100k cap), Wales access FBG-E (40%, £12-100k, quarterly windows), Scotland access CARES interest-free loans up to £150k + SRDP up to 50% on islands, Northern Ireland access DAERA (40%, annual spring window). Same project, different net cost based on region.
  3. 3. DNO connection — UKPN (London, SE, East) delivers UK's fastest G99 turnaround at 6-10 weeks. SSEN Highlands sometimes takes 10-20 weeks. ENWL, Northern Powergrid, NGED and SP Networks sit between. Connection capacity also varies — Wash + Norfolk coast + Mendip Levels + west Wales have known constraints.

Regional planning landscape

UK farm rooftop solar generally qualifies as permitted development under Class A or B of the GPDO. Region-specific constraints:

Related reading

Get a regional farm solar quote

Region-specific DNO timing, grant scheme and planning route built into your fixed-price proposal.

🔒 We never share your details. GDPR-compliant. Read our privacy notice.

3 days
Desk feasibility
7 days
Fixed-price proposal
90%+
FETF approval rate

Accredited and certified for UK commercial work

  • MCS Certified
  • NICEIC Approved
  • RECC Member
  • TrustMark Licensed
  • IWA Insurance-Backed
  • ISO 9001 / 14001

Commercial Solar Across the UK

For sector-agnostic commercial solar projects, see the UK commercial solar installation hub.

For dedicated agricultural building rooftop work, talk to the barn-roof solar specialists.

Running a non-farm UK business too? Visit the business solar specialists.

Looking at ground-mount alternatives like canopies? See the solar carport and canopy installers.

For comprehensive grant comparisons across all UK business sectors, read UK business solar grants explained.