Farming around Pershore
Pershore sits in the Vale of Evesham, known for Pershore plums, asparagus and soft fruit. The Avon valley floor carries horticultural and fruit-growing businesses with cold stores, irrigation and packhouses; mixed and dairy farming works the lower ground towards the River Severn, and arable the rising ground towards Bredon Hill.
Pershore at a glance
- County: Worcestershire
- Local planning authority: Wychavon District Council
- Network operator: National Grid Electricity Distribution (NGED)
- PVGIS output: about 999 kWh per kW a year on a 30° south-facing roof; 912 kWh at 10°
- June vs December (30° roof): about 124 kWh vs 31 kWh per kW
- DESNZ 2025/26 mean cost, 10–50 kW, the West Midlands: about £1,316 per kW (757 installations)
- Nearby towns: Evesham, Worcester, Upton upon Severn, Tewkesbury, Bredon, Eckington
What a farm roof near Pershore generates and costs
| System | Output a year, 30° roof | Output a year, 10° roof | Cost benchmark |
|---|---|---|---|
| 10 kW | 9,990 kWh | 9,120 kWh | about £13,160 (DESNZ regional mean × size) |
| 30 kW | 29,970 kWh | 27,360 kWh | about £39,480 (DESNZ regional mean × size) |
| 50 kW | 49,950 kWh | 45,600 kWh | about £65,800 (DESNZ regional mean × size) |
| 100 kW | 99,900 kWh | 91,200 kWh | No official figure above 50 kW — priced from itemised quotes |
| 250 kW | 249,750 kWh | 228,000 kWh | No official figure above 50 kW — priced from itemised quotes |
PVGIS assumes an unshaded, south-facing array with 14% system losses; east–west, shaded or dirty roofs produce less. The cost benchmark is DESNZ’s regional mean for MCS-certified 10–50 kW installations (including VAT where charged, excluding batteries). How quickly a system pays back depends on how much of the output the farm uses itself, because each unit used on site saves the full import price. See the farm solar cost guide for how quotes are built up.
Planning and grid around Pershore
Roof panels on a farm building around Pershore are normally permitted development under Class J of Part 14 of the General Permitted Development Order 2015, so Wychavon District Council does not need a planning application when the panels stay within its limits: there is no capacity cap; panels may stand no more than 0.2 m proud of a pitched roof or 1 m above a flat roof, and must be at least 1 m from the roof edge; and arrays above 50 kW need the council’s prior approval on design and glare. Listed buildings, buildings within their curtilage and scheduled monuments fall outside Class J, so panels on them need planning permission (and listed building consent for a listed building). In a conservation area or National Landscape the extra Class J restriction applies only to panels fixed to a wall that fronts a highway. Bredon Hill, to the south, is part of the Cotswolds National Landscape (formerly an AONB). That affects field arrays, which need full planning permission anyway; it does not remove Class J rights for roof panels. Parts of the River Avon corridor lie in Environment Agency flood zones, which matters for any new building on the farm, such as a battery store, rather than for panels on an existing roof.
National Grid Electricity Distribution (NGED) runs the network around Pershore. Systems up to 16 A per phase (3.68 kW on a single phase) connect under G98; anything larger needs a G99 application, and the operator's offer sets the timetable, any export limit and any reinforcement cost. Make the application before equipment is ordered.
Grants and tax relief for Pershore farms
- ✓ Improving Farm Productivity grant (England) — paid up to 25% towards rooftop and irrigation-reservoir solar (£15,000 to £100,000), but round 2 has closed and no new round has been announced. The FETF’s 2026 window closed at midday on 12 May 2026, and its item lists did not include solar panels to power a farm. See the 2026 grant position.
- ✓ Annual Investment Allowance — solar panels are special-rate plant, and most farm businesses can deduct the whole cost in year one through the £1m AIA (a partnership with a company as a member cannot claim it). Capital allowances for farm solar.
- ✓ Smart Export Guarantee — pays for exported surplus; systems up to 50 kW need MCS certification, and each licensed supplier sets its own rate.
- ✓ Sustainable Farming Incentive — has no solar action, and land under a solar array has its own Rural Payments Agency land-use code (UT01), which the RPA lists as a non-agricultural use.
What a good Pershore farm solar quote should include
- ✓ Sizing from your half-hourly meter data, not a rule of thumb
- ✓ A roof structure check by a competent person, and a structural engineer for unusual roofs
- ✓ An asbestos-cement assessment where the roof is fibre cement — HSE treats these roofs as fragile
- ✓ The G99 application to NGED, made before anything is ordered
- ✓ MCS certification for systems up to 50 kW, which Smart Export Guarantee suppliers ask for
- ✓ Written panel, inverter and workmanship warranty terms — and how the workmanship warranty is protected if the installer stops trading
- ✓ Commissioning records and monitoring handed over at the end