Farming around Evesham
The Vale of Evesham is known for horticulture — asparagus, soft fruit, brassicas and salad crops, much of it grown under polytunnels or glass. Cold stores, packhouse grading lines, irrigation pumps and tunnel ventilation keep electricity demand up through the growing season. Dairy farms work the River Avon corridor, and mixed arable holdings the higher ground towards Alcester and Bidford.
Evesham at a glance
- County: Worcestershire
- Local planning authority: Wychavon District Council
- Network operator: National Grid Electricity Distribution (NGED)
- PVGIS output: about 985 kWh per kW a year on a 30° south-facing roof; 901 kWh at 10°
- June vs December (30° roof): about 123 kWh vs 30 kWh per kW
- DESNZ 2025/26 mean cost, 10–50 kW, the West Midlands: about £1,316 per kW (757 installations)
- Nearby towns: Pershore, Alcester, Stratford-upon-Avon, Broadway, Worcester, Tewkesbury
What a farm roof near Evesham generates and costs
| System | Output a year, 30° roof | Output a year, 10° roof | Cost benchmark |
|---|---|---|---|
| 10 kW | 9,850 kWh | 9,010 kWh | about £13,160 (DESNZ regional mean × size) |
| 30 kW | 29,550 kWh | 27,030 kWh | about £39,480 (DESNZ regional mean × size) |
| 50 kW | 49,250 kWh | 45,050 kWh | about £65,800 (DESNZ regional mean × size) |
| 100 kW | 98,500 kWh | 90,100 kWh | No official figure above 50 kW — priced from itemised quotes |
| 250 kW | 246,250 kWh | 225,250 kWh | No official figure above 50 kW — priced from itemised quotes |
PVGIS assumes an unshaded, south-facing array with 14% system losses; east–west, shaded or dirty roofs produce less. The cost benchmark is DESNZ’s regional mean for MCS-certified 10–50 kW installations (including VAT where charged, excluding batteries). How quickly a system pays back depends on how much of the output the farm uses itself, because each unit used on site saves the full import price. See the farm solar cost guide for how quotes are built up.
Planning and grid around Evesham
Roof panels on a farm building around Evesham are normally permitted development under Class J of Part 14 of the General Permitted Development Order 2015, so Wychavon District Council does not need a planning application when the panels stay within its limits: there is no capacity cap; panels may stand no more than 0.2 m proud of a pitched roof or 1 m above a flat roof, and must be at least 1 m from the roof edge; and arrays above 50 kW need the council’s prior approval on design and glare. Listed buildings, buildings within their curtilage and scheduled monuments fall outside Class J, so panels on them need planning permission (and listed building consent for a listed building). In a conservation area or National Landscape the extra Class J restriction applies only to panels fixed to a wall that fronts a highway. The Cotswolds National Landscape (formerly an AONB) lies to the south-east, around Broadway. That affects field arrays, which need full planning permission anyway; it does not remove Class J rights for roof panels. Parts of the River Avon corridor lie in Environment Agency flood zones, which matters for any new building on the farm, such as a battery store, rather than for panels on an existing roof.
National Grid Electricity Distribution (NGED) runs the network around Evesham. Systems up to 16 A per phase (3.68 kW on a single phase) connect under G98; anything larger needs a G99 application, and the operator's offer sets the timetable, any export limit and any reinforcement cost. Make the application before equipment is ordered.
Grants and tax relief for Evesham farms
- ✓ Improving Farm Productivity grant (England) — paid up to 25% towards rooftop and irrigation-reservoir solar (£15,000 to £100,000), but round 2 has closed and no new round has been announced. The FETF’s 2026 window closed at midday on 12 May 2026, and its item lists did not include solar panels to power a farm. See the 2026 grant position.
- ✓ Annual Investment Allowance — solar panels are special-rate plant, and most farm businesses can deduct the whole cost in year one through the £1m AIA (a partnership with a company as a member cannot claim it). How capital allowances work for farm solar.
- ✓ Smart Export Guarantee — pays for exported surplus; systems up to 50 kW need MCS certification, and each licensed supplier sets its own rate.
- ✓ Sustainable Farming Incentive — has no solar action, and land under a solar array has its own Rural Payments Agency land-use code (UT01), which the RPA lists as a non-agricultural use.
What a good Evesham farm solar quote should include
- ✓ Sizing from your half-hourly meter data, not a rule of thumb
- ✓ A roof structure check by a competent person, and a structural engineer for unusual roofs
- ✓ An asbestos-cement assessment where the roof is fibre cement — HSE treats these roofs as fragile
- ✓ The G99 application to NGED, made before anything is ordered
- ✓ MCS certification for systems up to 50 kW, which Smart Export Guarantee suppliers ask for
- ✓ Written panel, inverter and workmanship warranty terms — and how the workmanship warranty is protected if the installer stops trading
- ✓ Commissioning records and monitoring handed over at the end