Back to Blog
Farm Types10 min read

Solar Panels for Grain Stores and Arable Farm Buildings: Complete Guide

Sarah Thompson, Renewable Energy Engineer12/01/2025

How arable farmers are using solar panels on grain stores, machinery sheds, and storage buildings. Includes seasonal energy management for harvest operations and drying systems.

Solar Panels for Grain Stores and Arable Farm Buildings: Complete Guide

# Solar Panels for Grain Stores and Arable Farm Buildings: Complete Guide

Arable farming presents unique opportunities for solar panel installation. Your large grain stores, machinery sheds, and storage buildings provide excellent roof space, while your seasonal energy patterns - particularly during harvest - make solar both practical and profitable.

If you're an arable farmer dealing with rising electricity costs, especially during grain drying season, solar panels could transform your energy economics.

## Why Arable Farms Are Ideal for Solar

### Large, Unshaded Roof Areas
Arable farms typically have some of the best buildings for solar installation:

- **Grain stores** - large, flat or pitched roofs with minimal obstructions
- **Machinery sheds** - wide-span buildings with excellent solar exposure
- **Storage buildings** - purpose-built structures often oriented optimally
- **Drying facilities** - buildings specifically designed for high energy use

### Seasonal Energy Patterns
Arable farms have distinct energy usage patterns that align well with solar generation:

**Spring/Summer (March-August):**
- Lower energy usage
- Maximum solar generation
- Opportunity for significant export income

**Harvest Season (August-October):**
- Peak energy demand for grain drying
- Good solar generation continues
- Maximum self-consumption benefits

**Winter (November-February):**
- Minimal energy usage
- Lower solar generation
- Reduced but still valuable savings

## Energy Usage on Arable Farms

### Primary Energy Consumers

**Grain Drying Systems**
- Typically the largest electricity consumer
- Can use 15-25 kWh per tonne of grain dried
- Seasonal usage concentrated in 6-8 weeks

**Grain Handling Equipment**
- Conveyors, elevators, and cleaning equipment
- Continuous operation during harvest
- Moderate but consistent power requirements

**Ventilation Systems**
- Grain store ventilation fans
- Critical for grain quality maintenance
- Year-round operation with seasonal peaks

**Workshop and Maintenance**
- Machinery maintenance equipment
- Welding, compressed air, lighting
- Year-round usage with seasonal variations

**Irrigation Systems** (where applicable)
- Pumps and control systems
- Summer operation aligning with peak solar

## Real Arable Farm Solar Case Study

**Hillside Arable Farm, Lincolnshire**
- **Farm size:** 800 acres mixed cereals
- **Buildings:** 3 grain stores, machinery shed, workshop
- **Solar system:** 120kW across multiple buildings
- **Installation cost:** £144,000
- **Annual generation:** 108,000 kWh
- **Annual savings:** £32,000
- **Payback period:** 4.5 years

"The solar installation has completely changed our harvest economics," explains farm manager Tom Richards. "We used to dread the electricity bills during grain drying season - now we're actually making money from excess generation during quiet periods."

## Solar System Design for Arable Farms

### Single Large Building Approach
**Best for:** Farms with one dominant building (large grain store)
- **System size:** 50-200kW
- **Installation:** Simpler, more cost-effective
- **Maintenance:** Easier access and monitoring

### Multi-Building Approach
**Best for:** Farms with several suitable buildings
- **System size:** 20-50kW per building
- **Installation:** More complex but flexible
- **Benefits:** Risk distribution, phased installation possible

### Ground-Mount Considerations
For farms without suitable roof space:
- **Land requirement:** 1 acre per 100kW approximately
- **Planning:** May require planning permission
- **Benefits:** Optimal orientation and maintenance access

## Grain Store Solar Installation Specifics

### Structural Considerations
**Building Age and Condition**
- Modern portal frame buildings (post-1980) typically suitable
- Older buildings may require structural assessment
- Asbestos roofs need specialist handling

**Roof Type Compatibility**
- **Fibre cement sheets:** Most common, excellent for solar
- **Metal cladding:** Good compatibility with rail systems
- **Concrete panels:** Suitable but may need specialist fixings

### Load Calculations
Solar panels add approximately 15-20kg per square metre:
- Most modern agricultural buildings can accommodate this
- Structural engineer assessment recommended for older buildings
- Snow loading considerations in exposed locations

## Seasonal Energy Management

### Harvest Season Optimization
**Peak Demand Period (August-October)**
During harvest, your energy usage can increase by 300-500%. Solar generation during this period can significantly reduce costs:

- **Morning drying operations** benefit from early solar generation
- **Afternoon peak generation** aligns with continuous drying
- **Battery storage** can extend solar benefits into evening operations

### Off-Season Benefits
**Winter Months (November-March)**
Even with lower generation, solar provides benefits:
- **Grain ventilation** powered by solar
- **Workshop heating** supplemented by solar
- **Export income** from excess generation

## Financial Analysis for Arable Farms

### Typical Investment and Returns

**Medium Arable Farm (500 acres)**
- **Suitable roof area:** 2,000m²
- **Recommended system:** 80kW
- **Installation cost:** £96,000
- **Annual generation:** 72,000 kWh
- **Annual savings:** £24,000
- **Simple payback:** 4.0 years

### Harvest Season Impact
The financial benefits are most dramatic during harvest:

**Pre-Solar Harvest Electricity Costs:** £8,000-£12,000
**Post-Solar Harvest Electricity Costs:** £2,000-£4,000
**Harvest Season Savings:** £6,000-£8,000

This means the solar system can pay for itself in harvest savings alone within 12-15 years, with all other benefits being additional profit.

## Grant Funding for Arable Farms

### DEFRA Improving Farm Productivity Grant
- **Funding level:** 25% of total project cost
- **Minimum grant:** £15,000
- **Maximum grant:** £100,000
- **Eligibility:** Agricultural businesses in England

### Countryside Stewardship
Some solar installations may qualify under environmental schemes, particularly if combined with:
- Biodiversity enhancements
- Water management improvements
- Carbon reduction initiatives

## Installation Process

### Pre-Installation (Weeks 1-4)
1. **Site survey** and structural assessment
2. **Energy usage analysis** including seasonal patterns
3. **System design** optimized for harvest operations
4. **Planning permissions** and DNO applications

### Installation Phase (Weeks 5-8)
1. **Scaffolding** and safety systems
2. **Roof preparation** and mounting systems
3. **Panel installation** and electrical connections
4. **Inverter installation** and grid connection
5. **Testing and commissioning**

### Timing Considerations
**Best installation periods:**
- **Spring (March-May):** Before busy season
- **Winter (December-February):** Minimal farm operations
- **Avoid:** Harvest season (August-October)

## Maintenance for Agricultural Buildings

### Regular Maintenance Tasks

**Monthly Checks**
- Visual inspection for damage
- Performance monitoring review
- Inverter status verification

**Seasonal Maintenance**
- **Pre-harvest inspection** (July)
- **Post-harvest cleaning** (November)
- **Annual electrical testing** (winter)

### Agricultural-Specific Considerations

**Dust Management**
Grain handling creates dust that can affect solar performance:
- **Monitoring systems** track performance impact
- **Cleaning schedules** during low-activity periods
- **Panel positioning** to minimize dust accumulation

**Harvest Season Precautions**
- **System monitoring** during peak usage
- **Emergency procedures** for equipment failures
- **Maintenance access** planning around operations

## Planning Permission and Regulations

### Permitted Development Rights
Most arable farm solar installations qualify for permitted development:
- **Building-mounted systems** under 1MW generally permitted
- **Ground-mounted systems** may require planning permission
- **Listed buildings** or conservation areas need special consideration

### Building Regulations
Solar installations typically require building regulations approval for:
- **Structural modifications**
- **Electrical installations**
- **Fire safety considerations**

## Environmental Benefits

### Carbon Footprint Reduction
A typical 100kW arable farm solar installation:
- **Reduces CO2 emissions:** 40 tonnes annually
- **Equivalent to:** 1,900 trees planted
- **Offsets:** 90,000 miles of car travel per year

### Biodiversity Opportunities
Solar installations can be combined with:
- **Wildflower strips** around ground-mount systems
- **Bird nesting boxes** on building-mounted systems
- **Pollinator-friendly landscaping**

## Technology Considerations

### Panel Selection
**Monocrystalline panels** are typically preferred for agricultural applications:
- **Higher efficiency** in limited roof space
- **Better low-light performance** for UK conditions
- **Longer warranties** (25+ years)

### Inverter Options
**String inverters** vs **Power optimizers:**
- **String inverters:** Lower cost, suitable for unshaded roofs
- **Power optimizers:** Better for complex roof shapes or partial shading

### Monitoring Systems
Essential for agricultural installations:
- **Real-time monitoring** of generation and consumption
- **Fault detection** and alert systems
- **Performance optimization** tools

## Future Considerations

### Battery Storage
While not essential initially, battery storage can provide:
- **Backup power** for critical grain ventilation
- **Peak shaving** during high-demand periods
- **Increased self-consumption** of solar generation

### Electric Vehicle Integration
As farm vehicles electrify:
- **EV charging** from solar generation
- **Fleet management** integration
- **Additional revenue streams** from vehicle-to-grid services

## Getting Started

### Initial Steps
1. **Energy audit** - analyze 12 months of electricity bills
2. **Building assessment** - identify suitable structures
3. **Professional consultation** - get expert system design
4. **Financial modeling** - calculate returns including grants
5. **Installation planning** - schedule around farm operations

### Choosing an Installer
Look for installers with:
- **Agricultural experience** and understanding
- **MCS certification** for quality assurance
- **Local presence** for ongoing support
- **Grant application expertise**

## Conclusion

Solar panels on grain stores and arable farm buildings represent an excellent investment opportunity. The combination of suitable buildings, seasonal energy patterns, and available grant funding creates compelling financial returns.

With typical payback periods of 4-6 years and system lifespans of 25+ years, solar installation can provide decades of reduced energy costs and additional income.

The key is proper system design that accounts for your specific energy patterns, particularly the high demands of harvest season operations.

*Ready to explore solar for your arable farm? Contact our agricultural solar specialists for a comprehensive assessment of your buildings and energy requirements.*

Related Articles

Ready to Get Started?

Get expert advice tailored to your specific farm type and requirements. Our specialists understand the unique challenges of farm types and can help you design the perfect solar solution.

  • Free consultation and site assessment
  • Custom system design and quotation
  • Grant application support included

Get Your Free Assessment

By submitting this form, you agree to be contacted about solar panel solutions for your farm. We respect your privacy and will never share your information.

Transform Your Farm with Solar Energy

Join hundreds of UK farmers who have reduced their energy costs with professional solar installations.